Back to All Modules
Inspections & Audits

LOLER Inspections

Lifting Operations and Lifting Equipment Regulations thorough examinations with 6/12-monthly scheduling and competent person tracking.

Overview

LOLER requires thorough examination of lifting equipment at prescribed intervals by a competent person. This module manages the entire LOLER lifecycle from equipment registration through to examination scheduling, defect management, and certification.

Equipment register tracks all lifting equipment including cranes, hoists, lift trucks, lifting accessories, and passenger/goods lifts. Examination intervals (6 or 12 months) are configured based on equipment type and use, with automatic scheduling ensuring examinations are never missed.

Competent person registers verify examiner qualifications, whilst examination certificates provide the legal documentation required to demonstrate compliance. Defect management workflows ensure equipment is taken out of service until defects are rectified and re-examined.

Regulatory Compliance

  • • Lifting Operations and Lifting Equipment Regulations 1998 (LOLER)
  • • Provision and Use of Work Equipment Regulations 1998 (PUWER)
  • • Health and Safety at Work Act 1974
  • • BS 7121 - Code of Practice for Safe Use of Cranes
Continuous Improvement Cycle1Plan2Do3Check4Act
LOLER Inspections

Key Benefits

Zero missed LOLER examinations through automatic scheduling

Legal compliance with documented examination certificates

Prevent lifting equipment failures through systematic inspection

Competent person tracking ensures examiner qualifications

Insurance compliance reduces premium costs

Equipment register provides instant access to lifting history

Features & Capabilities

Lifting equipment register with SWL and configuration tracking

6 and 12-month examination scheduling based on equipment type

Competent person register with qualification verification

Digital examination certificates with statutory information

Defect classification and prohibition workflows

Re-examination scheduling following defect rectification

Examination history tracking for audit evidence

Alert notifications for upcoming and overdue examinations

How It Works

1

Register lifting equipment with SWL, type, and examination interval

2

Schedule thorough examinations at 6 or 12-month intervals

3

Competent person conducts examination and records findings

4

Issue examination certificate and manage defects if identified

5

Re-examine following defect rectification before return to service

Ready to Use LOLER Inspections?

Start managing your health and safety with our comprehensive solution.

No credit card required · 14-day free trial · Cancel anytime