Overview
The Construction Phase Plan is a legal requirement for all notifiable construction projects, describing how health and safety will be managed throughout the construction phase. This module provides structured templates based on HSE guidance L153, ensuring comprehensive coverage of all regulatory requirements.
Section templates cover site rules, welfare facilities, emergency arrangements, traffic management, temporary works procedures, and specific high-risk activities. Integration with risk assessments, method statements, and permits ensures the CPP references actual site controls rather than generic statements.
Version control tracks plan development from tender through to as-built, whilst distribution features ensure all contractors receive and acknowledge the latest version. Regular review triggers ensure the plan remains current as the project evolves.
Regulatory Compliance
- • Construction (Design and Management) Regulations 2015 Regulation 12
- • HSE guidance L153 - Managing Health and Safety in Construction
- • Health and Safety at Work Act 1974
- • ISO 45001:2018 for construction environments
Key Benefits
Create comprehensive CPP in hours rather than days
Regulatory template ensures legal compliance with CDM 2015
Integration with site controls ensures CPP reflects actual practices
Version control tracks plan evolution throughout project
Distribution features ensure contractor acknowledgment
Review prompts maintain plan currency
Features & Capabilities
Structured CPP template based on HSE L153 guidance
Section editor for site rules, welfare, emergency procedures
Integration with risk assessments and method statements
Permit system linkage for high-risk work
Version control and change management
Distribution with contractor acknowledgment tracking
Regular review scheduling with automatic reminders
Export to PDF with professional formatting
How It Works
Create CPP using regulatory template with project-specific details
Complete each section with site-specific information and procedures
Link risk assessments, method statements, and permits
Distribute to contractors with acknowledgment tracking
Review and update as project conditions change